Filtered results 911 results found
Service
Field testing of IoT prototypes to monitor soil features and comparison to research-grade sensors FEM will support...
Infrastructure/Facility
At the Kąkolewo airport, located in the commune of Grodzisk Wielkopolski (58 km from the centre of Poznań), the...
Infrastructure/Facility
PSNC (Poznan Supercomputing and Networking Centre) provides access to a world-class e-infrastructure for the scientific...
Infrastructure/Facility
Private 5G networks compliant with the 3800-4200 MHz frequency management. The equipment also includes a system...
Infrastructure/Facility
PSNC provides the scientific community with access to world-class IT infrastructure. As the operator of the national...
Infrastructure/Facility
PSNC has a network of 20 units of phenological stations, consisting of a PTZ camera with 40x optical zoom and a GSM...
Infrastructure/Facility
The GNSS laboratory allows the use of a GNSS simulator, which produces a comprehensive range of emulated RF signals with...
Infrastructure/Facility
At Derval, the herd comprises 85 Prim'Holsteins and 75 heifers, with an annual production of 700,000 litres of milk...
Infrastructure/Facility
This facility is composed of an experimental milking machine, a modular milking parlour, and a milking robot.
Infrastructure/Facility
55-hectare plot of grassland with a 7-year rotation: 5 years of grassland, 2 years of crops. This plot can be harvested...
Infrastructure/Facility
32-hectare plot for silage corn growing. Sowing begins in early May, and harvesting begins in early September.
Infrastructure/Facility
15-hectare plot for cereal growing. Sowing around November and harvesting in July.